Particulars
|
Specifications
|
Technology
|
GSM (A1428), CDMA (A1429), HSPA (42.2/5.76 Mbps) EVDO (3.1 Mbps)
|
Body
|
Dimensions (123.8 x 58.6 x 7.6 mm), Weight (112 g / 3.95 oz),
|
Display
|
LED-backlit IPS LCD, Touch Screen 16M colors, Size (4.5 inches), 640 x 1136 resolution
|
Platform
|
Android 7.1.2 Nougat, Dual sim, Protection (Corning Gorilla Glass, oleophobic coating)
|
Memory
|
01 card slot, Internal (1 GB Ram + 16 GB storage), External (Up to 32 GB)
|
Camera
|
Rear camera (10 Mega Pixels), Front Camera (5 mega pixels), Video (1080p@30fps)
|
Battery
|
Stand by (Up to 225 hrs), talk time (Up to 8 Hrs), Music play (Up to 40 hrs) – Removable
|
Misc.
|
3.5 mm audio jack, colors (black, white silver & gold), Loudspeaker (66dB)
|
XXXXX
|
XXXXXX
|
XXXXXXX
|
Task Ref.
|
(Aug to XXX-XX)
|
XXXXXXXXXXXXXX XXXXXXXX, vision & mission
|
XXXXXXXXX of customer XXXXX
|
X
|
XXXXXXXXXX XX XXXXXXXX context XXX problem
|
XXXXXXX scope XXXXXXXX
|
2
|
XXXXXXXXX XXXXXXXX XXX XXXXXXXXXXX XXXXXXXX
|
Feasibility XXXXX
|
3
|
(Nov XX Feb-18)
|
Scope, XXXXXXXXXXX XXX XXXX statement
|
XXXXXXX XXXX, XXXXXXXX XXX XXX
|
X,X
|
Stakeholder analysis and XXXXXXXXXXXX XXXXXXXXXX
|
XXXXXXX's design XXXXXXXXXXX
|
X,3
|
XXXXXXX XX meeting XXX work XXXXXXXXXXXXXX
|
XXXXXXX XXXXXXXXX XXX beta XXXXXXX
|
X
|
Assumptions and constraints
|
Quality, risk, XXXXXXXXXXXXX XXX XX XXXXX
|
X
|
(Mar XX Nov-18)
|
Design, prototype, schedule XXX XXXX
|
Resources allocation XXX manufacturing
|
4,X
|
Market XXXXXXXX XXX XXXXXXXXXXX strategy
|
Market launch, progress XXXXXXXX, XXXXXX review
|
X,6
|
XXXX authorizations XXX XXXXXX requests
|
Variance analysis and corrective action XXXXX
|
X,X
|
XXXXXXX network, cost XXX XXXXX break-down
|
XXXX manual and XXXXXXXX contracts
|
7
|
XXXXX and XXXX XXXXXX requests
|
XXXXXXX of XXXXXXXX satisfaction surveys
|
X
|
(XXX to XXX-19)
|
End user response XXXXXXXXXXXXX
|
Comprehensive XXXXXXX XXXXXXXXXXXXX XXXXXXX
|
7,8
|
XXXXXXXXX contracts and XXXXX XXXXXXXXXXXX
|
XXXXXXX XXXXXXX document
|
8
|
Close-out XXXXXXX and rewarding XXXXXXXXXXX
|
XXXX completion audit XXX technical support
|
8
|
XXXX XXX.
|
Work XXXXXXXX (XXX XXXXXXX Development XXXXXXX)
|
XXXXXXXXXXX 1
|
Idea generation XXX XXXXXXXXX
|
XX 1
|
XXXXXXXX need XXXXXXXX XXX development of alternative ideas XXX XXXXXX
|
XX X
|
Screening XXXXX and selecting based on XXX XXXXXXXXXXX with existing XXXXXXX XXXX
|
WP X
|
XXXXXX XXXXXXXXXX XX NPD XXXXXXXXX XXXXXXXXXX and XXXXXXXXXXX XXXXXXXXXXXXXX
|
Deliverable 2
|
Concept XXXXXXXXXXX
|
XX X
|
Brainstorming XX XXXXXXXX creative ideas
|
WP 2
|
Retrieve XXXX XXXXXXX to XXXX in XXXXXXXXXXX XXXXXXX aspects XX XXXXXXXX product
|
WP 3
|
Use XXXXXXXX XXXXX XXXXXX (CAD) XXXXXXXXXX XX turn idea into initial XXXXXX
|
Deliverable X
|
Feasibility study
|
WP X
|
Evaluate a XXXXX XX economic, XXXXXXXXXXXXX, XXXXXXXXXXXXX XXX XXXXXXXXX factors
|
WP X
|
Ensure that the XXX XXXXXXX XXXXXXX XXXXXXXX XXXX
|
XX X
|
Define XXXXXXXXX XXXXXXXXXX XX XXXXXXX XXX XXXXXX XXXXX XXXXXXXXX XXXX XXXXXXX’s XXXXXX
|
Deliverable 4
|
XXXXXXXX XXXXXX
|
WP 1
|
XXX specifications XXXXX on initial XXXXXX XXX XXXXXXX key XXXXXXXXXXXXXXX XX product
|
XX 2
|
Produce drawings and XXXXXXXXX
|
XX X
|
Prototype testing through XXXXXXXXXX XXX XXXXXXXXXX acceptance XXXX sponsor (XXXXXX)
|
XXXXXXXXXXX 5
|
XXXXXXX development
|
WP 1
|
XXXXXXX XXXXXXXXX, equipment XXX XXXX XXXXXXXXX, consultants and other project XXXXX
|
WP 2
|
XXXXX-up production, XXXXX tools, XXXXXXX parts XXX XXXXXXXXX XXXXXXX
|
WP X
|
Manufacture in high XXXXXXX after XXXXXXX XXXXXXXXXXXX
|
XXXXXXXXXXX 6
|
Market XXXXXX and XXXXXXXXXXXX
|
WP 1
|
XXXXXXXX key XXXXXXX XXXXXXXX, create XXXXXXXXX and manuals plus XXXXXXXX conditions
|
XX 2
|
Start XXXXXXXXXXX campaign based XX marketing strategy and XXXXXX XXXXXXX identified
|
WP X
|
Establish XXXXXX chain and logistic partners for ordering and shipping
|
XXXXXXXXXXX X
|
XXXX XXXXXXXXXX XXX feedback
|
XX 1
|
Conduct surveys, XXXXXXXXXXXXXX XXX document XXXX XXXXXXXX
|
WP X
|
XXXXXX marketing strategy / XXXXX based on customer XXXXXXXXXXXX rate
|
WP X
|
Exercise XXXXXXX XXXXXXX XXXXXXXX XXXXXXXX and XXXXXXXX the XXXXXXX
|
XXXXXXXXXXX X
|
XXXXXXX XXXXXXX
|
XX 1
|
Creating a XXXXXXXXXXXXX project XXXXXXXXXXXXX archive
|
WP 2
|
XXXXXX contracts XXXX suppliers XXX XXXX XXXXX, XXXXXXXXXX resources XXX project XXXXX
|
XX X
|
Post XXXXXXXXXXXXXX XXXXXXX and XXXXXX, lessons XXXXXXX XXX XXXXX XXXXXXX
|
|
Sources XXXX: (XXXX,2008), (Turner, XXXX), (XXXXXX, XXXX), (PMBOK, 1996)
|