As a service engineer, I have to deal with many challenges. Year by year, the maintenance XXXXXX XXXX XXXX XXXXX the XXXXXXXXXX XX the IT infrastructure goes XX. XX and XX XXXX have to keep up the XXXX XXX compensate the XXXX of XXXXX XXX XXX constant XXXX XXXXXXXX with XXXXXXXX solutions. One XX XXX first XXXXX XXX to replace license-based software solutions with freeware XXX open XXXXXX ones. The Information XXXXXX XXXXXXXXXXXXXX XXXXXXX a bit XXX XX XXXXXXX XX XXXX XXXX XXXXX XXX XXXX XXXXXXXXX XXXXXXXXXXXX XXXX buying specialized support XXXXXXXX. XXX XXXX software remained XXX same XXX the background software XXX services XXXXXXX. XXX XXXX is XXX new. X major XXXXXXXX in XXXXXXX XXXXXXX XXXXXXXXXXXX it XXXXX XXX year XXXX (Fitzgerald, Kenny). Beaumont XXXXXXXX had a XXX of XXXXXXXX IT equipment with XXXX XXXXXXXXX XXXXXXX XX XXXXXXX with a XXXXXX CPU XXX 64 MB of RAM. At XXX workplace, XX had XX XXXX with a similar XXXXXXXXX. Without XXXXXXX XXXX I XXXX ever study Project XXXXXXXXXX XXX Information XXXXXX Infrastructure, I had to XXXX XX XXXX a XXXX XX XXXXXXX XXX XXXXXX and the XXXXXXXXXXX of the current infrastructure. XXXXX XX all, XX had to XXXX XXX XXXXXXX very well. Asking for extra XXXXX was out XX the XXXXXXXX. XXX XXXX was pressuring us XX XXXX XX with a plan XX improve XXX XXXXXXXXXXXXXX. XX we first XXXXXXXX the usage rates of XXXX system and XXXXXXXXX. Then XX identified the locations XXXX a resource XXXXXXXX and those XXXX plenty XX XXXXXX XXXX. XX the third step, we redesigned XXX XXXXXXXXXXXX and we XXXXXXXXX XXXXXXXX the XXXXXXXX solutions with XXXX that consumed fewer resources. XX the XXXX step, we implemented XXX new plan XXX collected XXXXXXXX from the XXXXX XXX XXXX XXX XXXXXXXX. XXXX this XXXXXXXXXX in mind, I managed to XXXXXXXXXX XXXXXXX XXXXXXXXXX XXX Information System Infrastructure in a better XXX. I already XXXX XXXX in Project Management, allocating the resources XXXXX XX a crucial XXXX. X XXXXXXX XXXXXXX XXXXX with a deadline XXX XXXX a XXXXXXX amount XX resources. XXXXX them with zero or minimum waste XXXX help a lot. Also, XX experience XXXX XXX XXXXXXXXXX XX XXXXXXXX at XXXX helped XX understand XXXX XXXXXX changing the architecture can XXXXXXX XXX XXXXXXXXXXX. The XXXX XXXXXXXXX XXX XX a XXXXXX XXXX XX used properly.
XXXXXXXXXX, B., &XXX; XXXXX, T. (XXXX). XXXXXXXXXX an information systems infrastructure with open source software. IEEE Software, XX(X), 50-XX. XXX:XX.1109/MS.XXXX.1259216